loader image

Start a project

F.A.Q

The process of creating an environment can take between 10 to 15 working days, depending on its complexity and the size of the space. The budgeting process can take between 5 to 10 working days.

During the creation process, the client will receive preliminary images, for
monitoring the work and checking the modeling. After the final rendering, requests for modifications are charged separately and may imply changes to the schedule.

Between three to four images depending on the space.

Yes, there is always this possibility. However, for this, it is necessary to mention in the questionnaire what you intend to reuse, with the respective photographs and measurements of the pieces.

No, despite not having a physical division, different environments are considered different divisions.

Yes, however, under price consultation. All the blocks are from our own library. For a specific reference block that the client needs to attach to the project, it is charged separately according to its value.

You can send us a hand drawing of this type: